Six floors of high-rise HVAC, zero tenant disruption

Downtown Denver · occupied Class A tower · 2026

Tenant-floor HVAC coming out of a working downtown tower: units, piping and supports across six floors, all of it through one freight elevator, with tenants above and below who never needed to know.

6Floors
23Mechanical units
About a mileCopper piping
10Working days
0Tenant complaints

The job

What we walked into

High-rise work is logistics. Every piece of every unit had to fit the freight elevator, every floor had to be protected and cleaned daily, and the building engineer's access windows were the schedule. A mile of copper condenser-water piping ran through ceilings on every floor.

The approach

How it went

  • Worked floor by floor: protect, section, stage, haul, clean, then move up.
  • Cut units and piping to elevator-sized sections and staged them in freight windows agreed with the building engineer.
  • Kept corridors protected and each floor broom-clean at the end of every day.
  • Separated copper from steel at the source so the salvage credit was real.

The result

Handed back

Twenty-three units and the piping out in ten working days with daily turnover, no tenant disruption, and the floors ready for the next phase of the renovation.

Before, during, after

The record

Client and site names withheld until written approval. Photographs are BCK job documentation.

During: Floor 8, units sectioned and staged
DuringFloor 8, units sectioned and staged
During: Floor 9 in progress
DuringFloor 9 in progress
During: Floor 10, staged for the freight window
DuringFloor 10, staged for the freight window
During: Floor 11, sectioned equipment
DuringFloor 11, sectioned equipment
During: Floor 11, piping down
DuringFloor 11, piping down
During: Haul-out through the loading dock
DuringHaul-out through the loading dock

What the client got

The closeout

Scope-of-work completion verification, a captioned photo record by work area, recovery documentation where refrigerant was involved, and a certification of completion signed by both managing members. Delivered with the final invoice.

Services on this job

All projects

Boilers. Chillers. Mechanical systems.
We make them disappear.

A range in about a minute, or a site walk and a written proposal within 48 hours. Either way you're talking to an owner.

Call (303) 641-1012 Get an estimate