Boiler & Chiller Killers HVAC demolition specialists · Denver

Services

HVAC and mechanical demolition

Heating, cooling and everything else in the room. Six ways the same crew, the same trucks and the same documentation show up, plus the umbrella page that explains how we think about all of it.

Start here

HVAC Demolition

What we take out, how the room is protected, what a closeout looks like, and why a crew that does only this beats the crew that does it once a year.

Read the overview →
Cast iron sectional boiler opened up for section-by-section demolition
Heating systems

Boiler Demolition

Cast iron sectional, firetube, watertube, steam, hot water, condensing. Residential basements to 52-million-BTU plants. Water heaters, flues and breeching come out with it.

Learn more →
Crew member inside the opened shell of a large chiller during demolition
Cooling systems

Chiller & Cooling Tower Demolition

Air-cooled and water-cooled chillers, rooftop cooling towers, condensers and rooftop units. Refrigerant recovered and documented under EPA 608 before anything is opened.

Learn more →
Large mechanical room cleared of equipment with the floor swept clean
Full strip-outs

Mechanical Room Demolition

Everything in the room: piping, ductwork, pumps, tanks, air handlers, hangers and supports. Cut at the agreed termination points, hauled out, and the floor swept, so the next trade starts with a clean room.

Learn more →
Rooftop air handling unit lifted by crane against a blue sky
Heavy moves

Rigging & Heavy Equipment Removal

Sectioning, skates, winches and cranes for equipment that was never meant to leave the building. The load path and the sequence are worked out before the torch is lit.

Learn more →
School boiler plant before a same-day demolition
When the schedule breaks

Same-Day, Next-Day & Emergency Demolition

The 10 p.m. call. A failed unit blocking a new install, a sub that fell through, a room that has to be empty by Monday. Three days of scope in one working day is something we have done more than once, and we like the challenge.

Learn more →
Truck bed loaded with cast iron boiler sections and pipe for haul-out downtown
Loaded, hauled, scrapped

Scrap & Equipment Haul-Away

Cast iron, steel, stainless, copper and dead equipment broken down, loaded and hauled to the yard. Recyclable metal gets recycled; the rest is disposed of to Colorado regulations.

Learn more →

Not sure which one?

Send photos. We'll tell you.

A picture of the equipment, the room and the door it leaves through is enough for a straight answer and a range. Email projects@boilerchillerkillers.com or text (303) 641-1012.

Boilers. Chillers. Mechanical systems.
We make them disappear.

A range in about a minute, or a site walk and a written proposal within 48 hours. Either way you're talking to an owner.

Call (303) 641-1012 Get an estimate