Boiler & Chiller Killers HVAC demolition specialists · Denver

Projects

Proof, not promises

Every commercial job gets photographed before, during and after. These are ours. Client and site names stay off the page until we have written approval to use them, because that is how we treat every client's information.

Stainless steel vessel suspended 24 feet up in a glass atrium before removal
Rigging · Occupied building

Twenty stainless vessels out of an occupied office tower

Downtown Denver · occupied office tower · 2026

A ground-floor process plant inside a working office tower, with tenants above, a lobby next door, and one vessel hanging 24 feet up in a glass atrium. Every piece had to come out through the building's own paths, on the building's schedule.

Read the case study →
Commercial kitchen exhaust hood line before removal
Refrigeration · Occupied building

A full commercial kitchen out, refrigerant recovered on six circuits

Downtown Denver · occupied office tower · 2026

The second contract in the same building: a complete commercial kitchen with a hood line, walk-in coolers and freezers, an industrial oven and an ice machine. Every refrigerated circuit had to be recovered and documented before a wrench touched it.

Read the case study →
Firetube boiler in a school mechanical room before demolition
Boiler demolition · K-12 campus

Two 4-million-BTU firetubes, six expansion tanks, three days

Denver · public school mechanical room · 2026

A school-district boiler room under a mechanical contractor's coordination: two 4M BTU firetubes, six expansion tanks hung from the ceiling, a heat exchanger and the piping between them, with an abatement crew working the same building.

Read the case study →
Sectioned HVAC equipment staged on a high-rise floor for haul-out
Mechanical strip-out · High-rise

Six floors of high-rise HVAC, zero tenant disruption

Downtown Denver · occupied Class A tower · 2026

Tenant-floor HVAC coming out of a working downtown tower: units, piping and supports across six floors, all of it through one freight elevator, with tenants above and below who never needed to know.

Read the case study →
Two-boiler plant in a school mechanical room before demolition
Boiler demolition · K-12 campus

A middle-school boiler plant, the mechanical pit, and 21 classroom units set

Northern Front Range · occupied middle school · 2026

A full heating-plant replacement on a campus that stayed in use: the boiler plant and the mechanical pit out, classroom heating equipment out of 38 rooms, and then 21 new classroom ventilation units placed for the mechanical contractor through corridors and openings that were never meant for them.

Read the case study →
Cast iron boiler plant in a school mechanical room before same-day demolition
Same-day · K-12 campus

Three days of scope, one working day, occupied school

Denver metro · occupied K-12 campus · 2026

The original contractor fell through and the replacement plant was on its way. We took the call, matched the schedule, and cleared the room in a day.

Read the case study →

More before-and-after sets from 2020 through 2025, chillers, deaerator tanks and cast iron sectionals among them, are being added as the archive is captioned. Ask and we will send the set that matches your job.

Boilers. Chillers. Mechanical systems.
We make them disappear.

A range in about a minute, or a site walk and a written proposal within 48 hours. Either way you're talking to an owner.

Call (303) 641-1012 Get an estimate